Frequently Asked Questions
- 01
The scope of work in a bathroom renovation can vary based on the client’s preferences and the condition of the space. However, a typical full bathroom renovation with Reno Rabbit generally includes:
Demolition – Removal of existing fixtures, finishes, and materials to prepare for the renovation.
Plumbing & Electrical Rough-Ins – This includes repositioning or upgrading systems as needed and installing all plumbing valves (e.g., shower, sink, toilet) to suit the new layout.
Shower Framing – Custom framing of the shower area to fit the new design.
Waterproofing with Water Test – Application of premium Schluter waterproofing systems followed by a 24-hour water test to ensure leak protection.
Tile Installation – Installation of floor and wall tiles using high-quality materials and techniques.
Baseboards & Trim Installation – Clean finishing details around walls, doors, and floors.
Vanity Installation – Professional installation of your chosen vanity.
Fixture & Toilet Installation – Includes sinks, faucets, shower fixtures, and toilet installation.
Light Fixture Installation – Electrical finishing with lighting and switches installed as per the design.
Painting – Final painting for walls and ceilings to complete the look.
Hardware Installation – This includes towel bars, toilet paper holders, robe hooks, and other accessories.
- 02
- 03